Wearable Sensors For Monitoring On-duty And Off-duty Worker Physiological Status And Activities In Construction.

Lee, Wonil; Lin, Ken-yu; Seto, Edmund; Migliaccio, Giovanni C. (2017). Wearable Sensors For Monitoring On-duty And Off-duty Worker Physiological Status And Activities In Construction. Automation In Construction, 83, 341 – 353.

View Publication

Abstract

Total Worker Health (R) (TWH) integrates occupational health and safety with the promotion of workers' off-duty wellbeing. Wearable sensors (e.g., activity trackers and physiological monitors) have facilitated personalized objective measurement of workers' health and wellbeing. Furthermore, the TWH concept is relevant to construction workers, especially roofing workers, as they encounter high on-duty health and safety risks and have poor off-duty lifestyles. This study examined the reliability and usability of wearable sensors for monitoring roofing workers' on-duty and off-duty activities. The results demonstrated the usability of these sensors and recommended a data collection period of three consecutive days for obtaining an intraclass correlation coefficient of 0.75 for heart rate, energy expenditure, metabolic equivalents, and sleep efficiency. The participants exhibited significant variations in their physical responses, health statuses, and safety behaviors. Moreover, several issues were identified in the application of wearable sensors to TWH evaluations for construction workers including roofers.

Keywords

Construction Workers; Wearable Technology; Employee Health Promotion; Roofing Industry; Body Sensor Networks; Health; Construction Safety And Health; Usability Study; Wearable Sensors; Worker Monitoring; Worker Physiology; Construction Industry; Ergonomics; Occupational Health; Occupational Safety; Patient Monitoring; Personnel; Roofs; Sleep; Off-duty Worker Physiological Status; Total Worker Health®; Off-duty Wellbeing; Activity Trackers; Physiological Monitors; Twh Concept; On-duty Health; Safety Risks; Off-duty Lifestyles; Monitoring Roofing Workers; Off-duty Activities; Health Statuses; Heart-rate-variability; Energy-expenditure; Health Protection; Physical-activity; Validity; Reliability; Validation; Promotion; Productivity; Actigraph

Data Fusion of Real-Time Location Sensing and Physiological Status Monitoring for Ergonomics Analysis of Construction Workers

Cheng, Tao; Migliaccio, Giovanni C.; Teizer, Jochen; Gatti, Umberto C. (2013). Data Fusion of Real-Time Location Sensing and Physiological Status Monitoring for Ergonomics Analysis of Construction Workers. Journal Of Computing In Civil Engineering, 27(3), 320 – 335.

View Publication

Abstract

Previous research and applications in construction resource optimization have focused on tracking the location of material and equipment. There is a lack of studies on remote monitoring for improving safety and health of the construction workforce. This paper presents a new approach for monitoring ergonomically safe and unsafe behavior of construction workers. The study relies on a methodology that utilizes fusion of data from continuous remote monitoring of construction workers' location and physiological status. To monitor construction workers activities, the authors deployed nonintrusive real-time worker location sensing (RTLS) and physiological status monitoring (PSM) technology. This paper presents the background and need for a data fusion approach, the framework, the test bed environment, and results to some case studies that were used to automatically identify unhealthy work behavior. Results of this study suggest a new approach for automating remote monitoring of construction workers safety performance by fusing data on their location and physical strain. DOI: 10.1061/(ASCE)CP.1943-5487.0000222. (C) 2013 American Society of Civil Engineers.

Keywords

Civil Engineering Computing; Construction Industry; Ergonomics; Occupational Health; Occupational Safety; Personnel; Sensor Fusion; Psm Technology; Rtls Technology; Construction Workforce Health; Construction Workforce Safety; Equipment Location; Material Location; Construction Resource Optimization; Construction Worker; Ergonomics Analysis; Physiological Status Monitoring; Realtime Location Sensing; Data Fusion; Exposure; Tracking; Demands; Sensors; System; Construction Worker Behavior; Remote Location Sensing; Work Sampling; Workforce Safety And Health

An Evaluation Of Wearable Sensors And Their Placements For Analyzing Construction Worker’s Trunk Posture In Laboratory Conditions.

Lee, Wonil; Seto, Edmund; Lin, Ken-yu; Migliaccio, Giovanni C. (2017). An Evaluation Of Wearable Sensors And Their Placements For Analyzing Construction Worker’s Trunk Posture In Laboratory Conditions. Applied Ergonomics, 65, 424 – 436.

View Publication

Abstract

This study investigates the effect of sensor placement on the analysis of trunk posture for construction activities using two off-the-shelf systems. Experiments were performed using a single-parameter monitoring wearable sensor (SPMWS), the ActiGraph GT9X Link, which was worn at six locations on the body, and a multi-parameter monitoring wearable sensor (MPMWS), the Zephyr BioHarnessTM3, which was worn at two body positions. One healthy male was recruited and conducted 10 experiment sessions to repeat measurements of trunk posture within our study. Measurements of upper-body thoracic bending posture during the lifting and lowering of raised deck materials in a laboratory setting were compared against video-captured observations of posture. The measurements from the two sensors were found to be in agreement during slow-motion symmetric bending activities with a target bending of <= 45. However, for asymmetric bending tasks, when the SPMWS was placed on the chest, its readings were substantially different from those of the MPMWS worn on the chest or under the armpit. (C) 2017 Elsevier Ltd. All rights reserved.

Keywords

Detectors; Construction Workers; Posture; Wearable Technology; Accelerometers; Work-related Injuries; Health; Accelerometer For Inclinometry; Construction Worker; Work-related Musculoskeletal Disorder; Motion Measurement; Position Measurement; Sensor Placement; Upper-body Thoracic Bending Posture Measurements; Trunk Posture Measurements; Zephyr Bioharness 3; Sensor Placement Effect; Construction Worker Trunk Posture Analysis; Wearable Sensor Evaluation; Asymmetric Bending Tasks; Slow-motion Symmetric Bending Activities; Mpmws; Multiparameter Monitoring Wearable Sensor; Actigraph Gt9x Link; Spmws; Single-parameter Monitoring Wearable Sensor; Low-back-pain; Physical-activity Assessment; Risk-factors; Musculoskeletal Disorders; Reliability; Movements; Validity; System; Gt3x+accelerometer

Automated Task-Level Activity Analysis through Fusion of Real Time Location Sensors and Worker’s Thoracic Posture Data

Cheng, Tao; Teizer, Jochen; Migliaccio, Giovanni C.; Gatti, Umberto C. (2013). Automated Task-Level Activity Analysis through Fusion of Real Time Location Sensors and Worker’s Thoracic Posture Data. Automation In Construction, 29, 24 – 39.

View Publication

Abstract

Knowledge of workforce productivity and activity is crucial for determining whether a construction project can be accomplished on time and within budget. Significant work has been done on improving and assessing productivity and activity at task, project, or industry levels. Task level productivity and activity analysis are used extensively within the construction industry for various purposes, including cost estimating, claim evaluation, and day-to-day project management. The assessment is mostly performed through visual observations and after-the-fact analyses even though previous studies show automatic translation of operations data into productivity information and provide spatial information of resources for specific construction operations. An original approach is presented that automatically assesses labor activity. Using data fusion of spatio-temporal and workers' thoracic posture data, a framework was developed for identifying and understanding the worker's activity type over time. This information is used to perform automatic work sampling that is expected to facilitate real-time productivity assessment. Published by Elsevier B.V.

Keywords

Detectors; Construction Projects; Labor Supply; Real-time Control; Construction Costs; Project Management; Machine Translating; Activity And Task Analysis; Construction Worker; Data Fusion; Health; Location Tracking; Productivity; Safety; Sensors; Thoracic Posture Data; Workforce; Construction Industry; Costing; Labour Resources; Sensor Fusion; Real-time Productivity Assessment; Automatic Work Sampling; Worker Activity Type; Spatio-temporal Data; Labor Activity Assessment; Construction Operations; Spatial Information; Productivity Information; Day-to-day Project Management; Claim Evaluation; Cost Estimating; Task Level Productivity; Industry Levels; Project Levels; Construction Project; Workforce Activity; Workforce Productivity; Worker Thoracic Posture Data; Real Time Location Sensors Fusion; Automated Task-level Activity Analysis; Construction-industry Productivity

Exploring the Influence of System Quality, Information Quality, and External Service on BIM User Satisfaction

Song, Jiule; Migliaccio, Giovanni C.; Wang, Guangbin; Lu, Hao. (2017). Exploring the Influence of System Quality, Information Quality, and External Service on BIM User Satisfaction. Journal Of Management In Engineering, 33(6).

View Publication

Abstract

Over the past decade, architecture, engineering and construction (AEC) companies around the world implemented building information modeling (BIM) to enhance their firms' competitiveness and readjust their business processes. Although substantial efforts have been made to implement BIM, previous research highlighted that implementation of BIM tools has not always resulted in satisfaction by users. Grounded in the literature on information systems and enterprise resource planning user satisfaction, this study tries to evaluate the success of BIM in terms of user satisfaction while controlling for the mediating effect of top-management support. The effects of four factors (i.e., system quality, information quality, external service, and top-management support) on BIM user satisfaction in AEC industries were examined through a survey of BIM users from China. Survey responses were analyzed with the partial least-squares method. The major contribution of this work lies in the findings that information quality, external service, and top-management support have a significant influence on BIM user satisfaction, and system quality did not have a significant influence on BIM user satisfaction. Moreover, top-management support acts as a mediating factor between external service and BIM user satisfaction. (C) 2017 American Society of Civil Engineers.

Keywords

Computing Satisfaction; Perceived Usefulness; Erp Systems; Success; Model; Performance; Technology; Acceptance; Tool; Determinants; Bim User Satisfaction; System Quality; Information Quality; External Services; Top-management Support

Using Workforce’s Physiological Strain Monitoring to Enhance Social Sustainability of Construction

Gatti, U.; Migliaccio, G.; Bogus, S.M.; Priyadarshini, S.; Scharrer, A. (2013). Using Workforce’s Physiological Strain Monitoring to Enhance Social Sustainability of Construction. Journal Of Architectural Engineering, 19(3), 179 – 85.

View Publication

Abstract

Sustainability is often described in terms of the triple bottom line, which refers to its environmental, economic, and social dimensions. However, the economic and environmental impacts of decisions have been easier to determine than have been the social impacts. One area of social sustainability that is particularly applicable to construction projects is that of construction workforce safety and well-being. This is a critical part of sustainability, and a socially sustainable construction industry needs to consider the safety and well-being of construction workers. However, construction activities are generally physically demanding and performed in harsh environments. Monitoring workers' physical strain may be an important step toward enhancing the social sustainability of construction. Recently introduced physiological status monitors (PSMs) have overcome the past limitations, allowing physical strain to be monitored without hindering workers' activities. Three commercially available PSMs have been selected and tested to assess their reliability in monitoring a construction workforce during dynamic activities. The results show that two of the PSMs are suitable candidates for monitoring the physiological conditions of construction workers. A survey was also conducted among industry practitioners to gain insight into industry needs and challenges for physical strain monitoring.

Keywords

Construction Industry; Environmental Factors; Labour Resources; Occupational Safety; Socio-economic Effects; Sustainable Development; Workforce Physiological Strain Monitoring; Social Sustainability; Socioeconomic Impacts; Environmental Impacts; Social Impacts; Construction Projects; Construction Workforce Safety; Physical Strain

Estimating Location-Adjustment Factors for Conceptual Cost Estimating Based on Nighttime Light Satellite Imagery

Zhang, Su; Bogus, Susan M.; Lippitt, Christopher D.; Migliaccio, Giovanni C. (2017). Estimating Location-Adjustment Factors for Conceptual Cost Estimating Based on Nighttime Light Satellite Imagery. Journal Of Construction Engineering And Management, 143(1).

View Publication

Abstract

A fundamental process in construction cost estimation is the appropriate adjustment of costs to reflect project location. Unfortunately, location adjustment factors are not available for all locations. To overcome this lack of data, cost estimators in the United States often use adjustment factors from adjacent locations, referred to as the nearest neighbor (NN) method. However, these adjacent locations may not have similar economic conditions, which limit the accuracy of the NN method. This research proposes a new method of using nighttime light satellite imagery (NLSI) to estimate location adjustment factors where they do not exist. The NLSI method for estimating location adjustment factors was evaluated against an established cost index database, and results show that NLSI can be used to effectively estimate location adjustment factors. When compared with NN and other alternative proximity-based location adjustment methods, the proposed NLSI method leads to a 25-40% reduction of the median absolute error. This work contributes to the body of knowledge by introducing a more accurate method for estimating location adjustment factors which can improve cost estimates for construction projects where location adjustment factors do not currently exist. (C) 2016 American Society of Civil Engineers.

Keywords

Construction Industry; Costing; Industrial Economics; Project Management; Remote Sensing; Location-adjustment Factors; Nighttime Light Satellite Imagery; Construction Cost Estimation; Project Location; United States; Economic Conditions; Nlsi Method; Cost Index Database; Median Absolute Error Reduction; Construction Projects; Nearest Neighbor Method; Urbanization Dynamics; Proxy; Construction Costs; Estimation; Construction Management; Pricing; Cost And Schedule

Empirical Assessment of Spatial Prediction Methods for Location Cost-Adjustment Factors

Migliaccio, Giovanni C.; Guindani, Michele; D’Incognito, Maria; Zhang, Linlin. (2013). Empirical Assessment of Spatial Prediction Methods for Location Cost-Adjustment Factors. Journal Of Construction Engineering & Management, 139(7), 858 – 869.

View Publication

Abstract

In the feasibility stage of a project, location cost-adjustment factors (LCAFs) are commonly used to perform quick order-of-magnitude estimates. Nowadays, numerous LCAF data sets are available in North America, but they do not include all locations. Hence, LCAFs for unsampled locations need to be inferred through spatial interpolation or prediction methods. Using a commonly used set of LCAFs, this paper aims to test the accuracy of various spatial prediction methods and spatial interpolation methods in estimating LCAF values for unsampled locations. Between the two regression-based prediction models selected for the study, geographically weighted regression analysis (GWR) resulted the most appropriate way to model the city cost index as a function of multiple covariates. As a direct consequence of its spatial nonstationarity, the influence of each single covariate differed from state to state. In addition, this paper includes a first attempt to determine if the observed variability in cost index values could be at least partially explained by independent socioeconomic variables. (C) 2013 American Society of Civil Engineers.

Keywords

Construction Industry; Interpolation; Regression Analysis; Socio-economic Effects; Spatial Prediction Methods; Location Cost-adjustment Factors; Empirical Assessment; Lcaf; Order-of-magnitude Estimates; North America; Unsampled Locations; Spatial Interpolation Methods; Geographically Weighted Regression Analysis; Gwr; Independent Socioeconomic Variables; Inflation; Indexes; Estimation; Geostatistics; Construction Costs; Planning; Budgeting

Temporal Effect of Construction Workforce Physical Strain on Diminishing Marginal Productivity at the Task Level

Lee, Wonil; Migliaccio, Giovanni C. (2018). Temporal Effect of Construction Workforce Physical Strain on Diminishing Marginal Productivity at the Task Level. Journal Of Construction Engineering And Management, 144(9).

View Publication

Abstract

Physiological status and environmental stressors are known to influence workforce performance at the individual worker level. A previous study, which conducted a cross-sectional comparison in repetitive material-handling construction activities, suggested that a U-shaped relationship existed between physical strain and productivity at the group level. This research revisits those findings to further investigate the U-curve relationship between physical strain and productivity at the group level and validate the concept of diminishing marginal productivity. Heart rates were measured as an indicator of subjects' physical strain, whereas task productivity was estimated by work sampling. Eighty person-hour data were converted into panel data sets by dividing each subject's 4-h experimental data into 5-min intervals. These data sets were subsequently used to evaluate the effects of time on physical strain and productivity with 5-min lags. The study found a U-curve relationship between physical strain and task-level productivity at the group level while controlling for individual characteristics. The U-shape relationship was constant in the low-performance and high-performance groups, although the degrees of the polynomials differed. Productive workers will remain more productive than low-productive workers with increased physical strain.

Keywords

Construction Industry; Industrial Psychology; Labour Resources; Occupational Health; Polynomials; Productivity; Physiological Status; Environmental Stressors; U-shaped Relationship; Productive Workers; Polynomials Degree; Diminishing Marginal Productivity; Construction Workforce Physical Strain; Labor Productivity; Scientific Management; Shift Work; Performance; Model; Taylorism; Burnout; Design; Impact; Safety; Construction Productivity; Labor And Personal Issue; Work Physiology; Physical Strain

Design Management in Design-Build Megaprojects: SR 99 Bored Tunnel Case Study

Gatti, U.C.; Migliaccio, G.C.; Laird, L. (2014). Design Management in Design-Build Megaprojects: SR 99 Bored Tunnel Case Study. Practice Periodical On Structural Design And Construction, 19(1), 148-58.

View Publication

Abstract

The increasing use of the design-build project delivery method has resulted in it now being one of the most popular nontraditional methods for delivering road, bridge, mass transit, and rail projects in the United States. However, although the use of design-build is widespread, there remains a substantial lack of information about how to effectively plan and implement design management procedures for design-build transportation projects. In particular, transportation agencies lack information about how to shape appropriate design management roles for various contractual parties and to manage design activities for design-build megaprojects. To fill this gap, this paper presents a case study of the SR 99 Bored Tunnel project in Seattle, Washington. It provides detailed information on how the owner, the Washington State DOT (WSDOT), incorporated design management procedures into its requirements and how the design-builder, Seattle Tunnel Partners, implemented them within its project management processes.

Keywords

Boring; Design Engineering; Project Management; Tunnels; Design-build Megaproject; Design-build Project Delivery Method; Road Project; Bridge Project; Mass Transit Project; Rail Project; United States; Design-build Transportation Project; Transportation Agency; Sr 99 Bored Tunnel Project; Seattle; Washington State Dot; Wsdot; Design Management; Project Management Process