Efficiency Index for Fiber-Reinforced Concrete Lining at Ultimate Limit State

Fantilli, Alessandro P.; Nemati, Kamran M.; Chiaia, Bernardino. (2016). Efficiency Index for Fiber-Reinforced Concrete Lining at Ultimate Limit State. Sustainable And Resilient Infrastructure, 1(1-2), 84 – 91.

View Publication

Abstract

The fiber contribution to the ultimate limit state capacity of precast and cast-in situ tunnel linings is analytically investigated. By means of a numerical model, capable of computing the interaction curves of reinforced concrete cross sections subjected to combined compressive and bending actions, the mechanical performances of plain and fiber-reinforced concrete are compared. As a result, a new index is introduced to quantify the effectiveness of fiber addition. The higher the efficiency index, the higher the amount of steel reinforcing bar that can be removed from a plain concrete cross section. The application to real concrete linings, where shear resistance is ensured without shear reinforcement, shows that a large volume of rebar can be saved by the presence of steel fibers. This gives significant advantages in terms of durability and rapidity of tunnel construction.

Keywords

Fiber-reinforced Concrete; Efficiency Index; Ultimate Limit State; Cast-in Situ Concrete Lining; Precast Tunnel Segments

Accelerated Construction of Urban Intersections with Portland Cement Concrete Pavement (PCCP)

Nemati, Kamran M.; Uhlmeyer, Jeff S. (2021). Accelerated Construction of Urban Intersections with Portland Cement Concrete Pavement (PCCP). Case Studies In Construction Materials, 14.

View Publication

Abstract

The frequent maintenance required on asphalt concrete (AC) pavement sections has made reconstruction with portland cement concrete pavement (PCCP) a feasible alternative. However, many constructability issues need to be addressed in order to realize the full potential of this alternative. Accelerated paving encompasses three classes of activities: methods to accelerate the rate of strength gain, methods to minimize the construction time, and traffic control strategies to minimize user delay. In this paper a case study will be presented in which an AC intersection was reconstructed with portland cement concrete pavement. The entire reconstruction of the intersection, including demolition of the AC pavement and its replacement with PCCP, took place over a period of three days, starting on Thursday evening and opening the intersection to the traffic on Sunday afternoon. This paper documents this effort in order to provide practitioners additional options for rapid reconstruction of urban intersections and includes documentation of the construction process, traffic management strategies, and an analysis of the costs. The results of this investigation can be used to educate pavement construction professionals and the academic community on the use of PCCP for accelerated reconstruction of major urban intersections with minimal user and traffic disruption, using innovative construction techniques and traffic management optimization principles. This investigation produced valuable information to demonstrate that concrete pavements can be constructed efficiently and quickly. (C) 2021 The Authors. Published by Elsevier Ltd.

Keywords

Concrete; Accelerated Construction; Pavement; Portland Cement Concrete Pavement; Maturity Method