Minimization of Socioeconomic Disruption for Displaced Populations Following Disasters.

El-Anwar, Omar; El-Rayes, Khaled; Elnashai, Amr. (2010). Minimization of Socioeconomic Disruption for Displaced Populations Following Disasters. Disasters, 34(3), 865 – 883.

View Publication

Abstract

In the aftermath of catastrophic natural disasters such as hurricanes, tsunamis and earthquakes, emergency management agencies come under intense pressure to provide temporary housing to address the large-scale displacement of the vulnerable population. Temporary housing is essential to enable displaced families to reestablish their normal daily activities until permanent housing solutions can be provided. Temporary housing decisions, however, have often been criticized for their failure to fulfil the socioeconomic needs of the displaced families within acceptable budgets. This paper presents the development of (1) socioeconomic disruption metrics that are capable of quantifying the socioeconomic impacts of temporary housing decisions on displaced populations; and (2) a robust multi-objective optimization model for temporary housing that is capable of simultaneously minimizing socioeconomic disruptions and public expenditures in an effective and efficient manner. A large-scale application example is optimized to illustrate the use of the model and demonstrate its capabilities ingenerating optimal plans for realistic temporary housing problems.

Keywords

Natural Disasters; Hurricanes; Disaster Relief; Temporary Housing; Tsunamis; Multi-objective Optimization; Post-disaster Recovery; Social Welfare; Socioeconomic Disruption

A Case Study of Activity-Based Costing in Allocating Rebar Fabrication Costs to Projects

Kim, Yong-Woo; Han, Seungheon; Shin, Sungwon; Choi, Kunhee. (2011). A Case Study of Activity-Based Costing in Allocating Rebar Fabrication Costs to Projects. Construction Management And Economics, 29(5), 449 – 461.

View Publication

Abstract

How to improve cost allocation for reinforced steel bar (rebar) is an ongoing topic of debate among construction manufacturers and contractors. Traditionally, many fabrication shops have used a single overhead-cost pool accounting system. However, a new costing method, activity-based costing (ABC), may provide more advantages than the traditional system. In this case study, a single overhead-cost pool system is compared with the ABC method to demonstrate how ABC improves cost allocation and provides other benefits. The case study findings indicate that ABC provides such benefits as (1) accurate manufacturing costs; (2) cost information on processes; and (3) information on cost drivers. This paper also bridges the construction and cost accounting literature. Our study contributes to the construction management literature by offering a different cost allocation method to refine fabrication costs assigned to projects. The findings are expected to serve as a reference for industry professionals who recognize the shortcomings of a traditional single overheadcost pool system and are in need of a more accurate costing system. © 2011 Taylor & Francis.

Keywords

Bridges; Costs; Fabrication; Lakes; Project Management; Rebar; Accounting System; Activity Based Costing; Construction Management; Fabrication Shops; Industry Professionals; Manufacturing Cost; Overhead Costs; Traditional Systems

Environmental Determinants of Unscheduled Residential Outages in the Electrical Power Distribution of Phoenix, Arizona

Maliszewski, Paul J.; Larson, Elisabeth K.; Perrings, Charles. (2012). Environmental Determinants of Unscheduled Residential Outages in the Electrical Power Distribution of Phoenix, Arizona. Reliability Engineering & System Safety, 99, 161 – 171.

View Publication

Abstract

The sustainability of power infrastructures depends on their reliability. One test of the reliability of an infrastructure is its ability to function reliably in extreme environmental conditions. Effective planning for reliable electrical systems requires knowledge of unscheduled outage sources, including environmental and social factors. Despite many studies on the vulnerability of infrastructure systems, the effect of interacting environmental and infrastructural conditions on the reliability of urban residential power distribution remains an understudied problem. We model electric interruptions using outage data between the years of 2002 and 2005 across Phoenix, Arizona. Consistent with perceptions of increased exposure, overhead power lines positively correlate with unscheduled outages indicating underground cables are more resistant to failure. In the presence of overhead lines, the interaction between birds and vegetation as well as proximity to nearest desert areas and lakes are positive driving factors explaining much of the variation in unscheduled outages. Closeness to the nearest arterial road and the interaction between housing square footage and temperature are also significantly positive. A spatial error model was found to provide the best fit to the data. Resultant findings are useful for understanding and improving electrical infrastructure reliability. (C) 2011 Elsevier Ltd. All rights reserved.

Keywords

Determinants (mathematics); Electric Power Distribution; Reliability In Engineering; Social Factors; Temperature Effect; Phoenix (ariz.); Arizona; Distribution; Electricity; Interruption; Outage; Reliability; System Reliability Assessment; Maintenance; Overhead; Model; Interruptions; Regression; Flashover; Failures; Performance; Hurricanes

Maximising the Net Social Benefit of the Construction of Post-Disaster Alternative Housing Projects

El-Anwar, Omar. (2013). Maximising the Net Social Benefit of the Construction of Post-Disaster Alternative Housing Projects. Disasters, 37(3), 489 – 515.

View Publication

Abstract

The widespread destruction that follows large-scale natural disasters, such as Hurricane Katrina in August 2005, challenges the efficacy of traditional temporary housing methods in providing adequate solutions to housing needs. Recognising these housing challenges, the Congress of the United States allocated, in 2006, USD 400 million to the Department of Homeland Security to support Alternative Housing Pilot Programs, which are intended to explore the possibilities of providing permanent and affordable housing to displaced families instead of traditional temporary housing. This paper presents a new methodology and optimisation model to identify the optimal configurations of post-shelter housing arrangements to maximise the overall net socioeconomic benefit. The model is capable of quantifying and optimising the impacts of substituting temporary housing with alternative housing on the social and economic welfare of displaced families as well as the required additional costs of doing so. An application example is presented to illustrate the use of the model and its capabilities.

Keywords

Public Housing; Temporary Housing; Hurricane Katrina, 2005; Natural Disasters; Socioeconomic Factors; Mathematical Models; Mathematical Optimization; United States; Alternative Housing Pilot Programs; Optimisation; Socioeconomic Benefit; Disasters

Subdivision Vintage and Housing Prices: Do Home Buyers Value Traditional Development?

Bitter, Christopher. (2014). Subdivision Vintage and Housing Prices: Do Home Buyers Value Traditional Development? Urban Studies, 51(5), 1038 – 1056.

View Publication

Abstract

New Urbanism and traditional neighbourhood development (TND) have been championed as solutions to the problems associated with post-war suburban sprawl. However, they have yet to capture a substantial share of the US housing market. The market context for TND is not well understood as the paucity of TND makes it difficult to study directly. This paper takes a novel approach by focusing on the market for 'traditional' development itself, defined as subdivisions recorded prior to World War II, in the sprawling Tucson, Arizona, MSA. The results of the hedonic analysis demonstrate that home buyers value the features embodied in traditional development, as homes in subdivisions platted before 1940 command premiums over those in their modern counterparts, even after carefully controlling for locational and structural characteristics. Moreover, the analysis finds that the premiums have increased through time, which suggests growing demand for traditionally designed subdivisions.

Keywords

Land-use; Neighborhood; Urbanism; Transportation; Preferences; Choice; Time

Advancing Impact of Education, Training, and Professional Experience on Integrated Project Delivery

Hyun Woo Lee; Anderson, S.M.; Yong-Woo Kim; Ballard, G.. (2014). Advancing Impact of Education, Training, and Professional Experience on Integrated Project Delivery. Practice Periodical On Structural Design And Construction, 19(1), 8 – 14.

View Publication

Abstract

With the increased interest in applying integrated forms of project delivery to complex and uncertain construction projects, the building industry has been experiencing an increased demand for integrated project delivery (IPD). With the trend, many empirical studies have examined the collaborative characteristics of IPD and reported that participants must make the necessary transition for its contractual, technological, and cultural requirements. However, little study has been done to investigate relevant education, training, or professional experience that can support the transition. In response, this study used an online survey that was designed to investigate the level and type of education, training, and professional experience of project members and their corresponding level of background knowledge for each IPD requirement. The key survey findings include (1) project members have the highest level of background knowledge on the cultural requirements of IPD, but the lowest level on the technological requirements; (2) the group with more design-build experience has more background knowledge; (3) the group that received an IPD kick-off training has more background knowledge; and (4) having a lean construction class can prepare students for the IPD environment. It is expected that the survey findings will advance the education, training, and levels of background knowledge of IPD participants, which will enhance their IPD experience accordingly.

Keywords

Buildings (structures); Construction Industry; Contracts; Cultural Aspects; Industrial Training; Professional Aspects; Project Management; Construction Project; Building Industry; Integrated Project Delivery; Ipd; Contractual Requirement; Cultural Requirement; Professional Experience; Design-build Experience; Training Impact; Education Impact

Barriers to Effective Implementation of Quality Management Systems in Public Design Projects in Iran

Abdirad, Hamid; Nazari, Ahad. (2015). Barriers to Effective Implementation of Quality Management Systems in Public Design Projects in Iran. Architectural Engineering And Design Management, 11(6), 457 – 474.

View Publication

Abstract

The goal of this research is to investigate why architectural design practice in the public domain in Iran has not implemented quality management systems (QMSs) as effectively as expected. Through an in-depth review of the literature and a set of interviews, a framework of challenges is identified and validated, and it served as the basis of a survey among high-ranked design firms active in public projects. This study shows that there are many barriers to reach design excellence, rooted in general policies and standards, characteristics of clients' organizations, and strategies and organizational factors in design firms. Although many design firms and agencies in Iran have certification of accredited QMSs, realities of architectural design practice show that norms in public projects clearly contradict principles of QMSs and make them ineffective. This study reveals a strong need for developing QMSs that address (1) true definition of design quality in standards and guidelines, (2) importance of final users and public community as true customers of public projects, (3) strategies in design firm management and organizational structures, (4) prerequisites of learning cycle in design projects, and (5) modifications in cultures and interactions among parties involved in design decision-making.

Keywords

Quality Assurance; Public Building Design & Construction; Architectural Design; Construction Project Management; Construction Industry; Iran; Architectural Practice; Design Management; Design Quality; Public Buildings; Quality Management; Organizational Factors; Organizational Structures; Quality Management Systems; Standards And Guidelines; Decision Making; 0

Exposure Path Perceptions and Protective Actions in Biological Water Contamination Emergencies

Lindell, Michael K.; Mumpower, Jeryl L.; Huang, Shih-kai; Wu, Hao-che; Samuelson, Charles D. (2015). Exposure Path Perceptions and Protective Actions in Biological Water Contamination Emergencies. Environmental Health Insights, 9, 13 – 21.

View Publication

Abstract

This study extends the Protective Action Decision Model, developed to address disaster warning responses in the context of natural hazards, to boil water advisories. The study examined 110 Boston residents' and 203 Texas students' expectations of getting sick through different exposure paths for contact with contaminated water. In addition, the study assessed respondents' actual implementation (for residents) or behavioral expectations (for students) of three different protective actions - bottled water, boiled water, and personally chlorinated water - as well as their demographic characteristics and previous experience with water contamination. The results indicate that people distinguish among the exposure paths, but the differences are small (one-third to one-half of the response scale). Nonetheless, the perceived risk from the exposure paths helps to explain why people are expected to consume (or actually consumed) bottled water rather than boiled or personally chlorinated water. Overall, these results indicate that local authorities should take care to communicate the relative risks of different exposure paths and should expect that people will respond to a boil water order primarily by consuming bottled water. Thus, they should make special efforts to increase supplies of bottled water in their communities during water contamination emergencies.

Keywords

Water Contamination; Exposure Paths; Risk Perception; Protective Action

Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions

Choi, Kunhee; Lee, Hyun Woo; Bae, Junseo; Bilbo, David. (2016). Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions. Journal Of Construction Engineering And Management, 142(3).

View Publication

Abstract

Accelerated contract provisions (ACPs) such as cost-plus-time (A+B) and incentives/disincentives (I/D) are increasingly common, yet very little is known about their pure time-cost performance effects on change orders. To fill this large knowledge gap, a two-stage research methodology drawing on 1,372 highway improvement projects completed in California was adopted for this study. The Stage I study investigated the marginal change-order impacts of two ACPs, pure A+B and I/D combined with A+B. How ACP change orders affect projects' time-cost performance was numerically modeled and successfully validated over the Stage II study. The results clearly showed that both ACPs led to more schedule-change and cost-change orders than conventionally contracted projects, whereas I/D combined with A+B performed significantly better than pure A+B in terms of the magnitude of schedule-change orders. This conveys an important recommendation to state transportation agencies (STAs) that A+B be used with an I/D provision. The results and numerical models of this study would help STAs better assess and justify the impact of change orders on the duration and cost of projects, enabling them to more effectively use contingency amounts. Use of the models can also benefit contractors requesting a change order because the models can provide them with advanced knowledge of the probable time-cost growth rates specifically for the pursued ACP. (C) 2015 American Society of Civil Engineers.

Keywords

Construction Industry; Contracts; Costing; Incentive Schemes; Numerical Analysis; Order Processing; Performance Evaluation; Roads; Scheduling; Time Management; Transportation; Projects Time-cost Performance Effect; Cost-change Order; Accelerated Contract Provision; Knowledge Gap; California; Acp; Schedule-change Order; State Transportation Agency; Numerical Model; Sta; Incentive; Highway Improvement Project; Labor Productivity; Construction; Impact; Model; Projects; Change Order; Highway Rehabilitation; Decision Modeling; Regression; Validation; Contracting

Spatial Energetics Integrating Data from GPS, Accelerometry, and GIS to Address Obesity and Inactivity

James, Peter; Jankowska, Marta; Marx, Christine; Hart, Jaime E.; Berrigan, David; Kerr, Jacqueline; Hurvitz, Philip M.; Hipp, J. Aaron; Laden, Francine. (2016). Spatial Energetics Integrating Data from GPS, Accelerometry, and GIS to Address Obesity and Inactivity. American Journal Of Preventive Medicine, 51(5), 792 – 800.

View Publication

Abstract

To address the current obesity and inactivity epidemics, public health researchers have attempted to identify spatial factors that influence physical inactivity and obesity. Technologic and methodologic developments have led to a revolutionary ability to examine dynamic, high-resolution measures of temporally matched location and behavior data through GPS, accelerometry, and GIS. These advances allow the investigation of spatial energetics, high-spatiotemporal resolution data on location and time-matched energetics, to examine how environmental characteristics, space, and time are linked to activity-related health behaviors with far more robust and detailed data than in previous work. Although the transdisciplinary field of spatial energetics demonstrates promise to provide novel insights on how individuals and populations interact with their environment, there remain significant conceptual, technical, analytical, and ethical challenges stemming from the complex data streams that spatial energetics research generates. First, it is essential to better understand what spatial energetics data represent, the relevant spatial context of analysis for these data, and if spatial energetics can establish causality for development of spatially relevant interventions. Second, there are significant technical problems for analysis of voluminous and complex data that may require development of spatially aware scalable computational infrastructures. Third, the field must come to agreement on appropriate statistical methodologies to account for multiple observations per person. Finally, these challenges must be considered within the context of maintaining participant privacy and security. This article describes gaps in current practice and understanding and suggests solutions to move this promising area of research forward. (C) 2016 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

Keywords

Physical-activity Levels; Built Environment; Activity Monitors; Travel Behavior; Health Research; Neighborhood; Exposure; Validation; Children; Design