Yi, June-Seong; Kim, Yong-Woo; Kim, Ki-Aeng; Koo, Bonsang. (2012). A Suggested Color Scheme for Reducing Perception-Related Accidents on Construction Work Sites. Accident Analysis And Prevention, 48, 185 – 192.
View Publication
Abstract
Changes in workforce demographics have led to the need for more sophisticated approaches to addressing the safety requirements of the construction industry. Despite extensive research in other industry domains, the construction industry has been passive in exploring the impact of a color scheme: perception-related accidents have been effectively diminished by its implementation. The research demonstrated that the use of appropriate color schemes could improve the actions and psychology of workers on site, thereby increasing their perceptions of potentially dangerous situations. As a preliminary study, the objects selected by rigorous analysis on accident reports were workwear, safety net, gondola, scaffolding, and safety passage. The colors modified on site for temporary facilities were adopted from existing theoretical and empirical research that suggests the use of certain colors and their combinations to improve visibility and conspicuity while minimizing work fatigue. The color schemes were also tested and confirmed through two workshops with workers and managers currently involved in actual projects. The impacts of color schemes suggested in this paper are summarized as follows. First, the color schemes improve the conspicuity of facilities with other on site components, enabling workers to quickly discern and orient themselves in their work environment. Secondly, the color schemes have been selected to minimize the visual work fatigue and monotony that can potentially increase accidents. (C) 2011 Elsevier Ltd. All rights reserved.
Keywords
Construction Industry Accidents; Industrial Hygiene; Industrial Safety; Empirical Research; Sensory Perception; Work Environment; Demographic Surveys; Job Performance; Color Scheme; Construction Industry; Labor Demography; Perception-related Accident; Accident Prevention; Accidents; Demography; Human Resource Management; Population Statistics; Color Schemes; Construction Works; Dangerous Situations; Rigorous Analysis; Safety Requirements; Temporary Facilities; Work Environments; Psychological Climate; Drivers; Emotion; Model
Migliaccio, Giovanni C.; Guindani, Michele; D’Incognito, Maria; Zhang, Linlin. (2013). Empirical Assessment of Spatial Prediction Methods for Location Cost-Adjustment Factors. Journal Of Construction Engineering & Management, 139(7), 858 – 869.
View Publication
Abstract
In the feasibility stage of a project, location cost-adjustment factors (LCAFs) are commonly used to perform quick order-of-magnitude estimates. Nowadays, numerous LCAF data sets are available in North America, but they do not include all locations. Hence, LCAFs for unsampled locations need to be inferred through spatial interpolation or prediction methods. Using a commonly used set of LCAFs, this paper aims to test the accuracy of various spatial prediction methods and spatial interpolation methods in estimating LCAF values for unsampled locations. Between the two regression-based prediction models selected for the study, geographically weighted regression analysis (GWR) resulted the most appropriate way to model the city cost index as a function of multiple covariates. As a direct consequence of its spatial nonstationarity, the influence of each single covariate differed from state to state. In addition, this paper includes a first attempt to determine if the observed variability in cost index values could be at least partially explained by independent socioeconomic variables. (C) 2013 American Society of Civil Engineers.
Keywords
Construction Industry; Interpolation; Regression Analysis; Socio-economic Effects; Spatial Prediction Methods; Location Cost-adjustment Factors; Empirical Assessment; Lcaf; Order-of-magnitude Estimates; North America; Unsampled Locations; Spatial Interpolation Methods; Geographically Weighted Regression Analysis; Gwr; Independent Socioeconomic Variables; Inflation; Indexes; Estimation; Geostatistics; Construction Costs; Planning; Budgeting
Dossick, Carrie Sturts(1). (2014). Messy Work in Virtual Worlds: Exploring Discovery and Synthesis in Virtual Teams. Lecture Notes In Computer Science (including Subseries Lecture Notes In Artificial Intelligence And Lecture Notes In Bioinformatics), 8683, 134 – 142.
View Publication
Abstract
The challenges of engineering team collaboration—establishing trust, fostering productive informal communication, cultivating knowledge exchange—are often exacerbated in virtual teams by geographical separation as well as team members’ cultural and linguistic differences. Researchers have observed that powerful collaboration in collocated teams is supported by shared visualizations with which the team engages in informal, flexible and active ways. In studying virtual team interactions in a virtual world known as the CyberGRID, we see that just as with AEC collocated teams, shared visualizations were instrumental for the teams as they define, understand, and generate knowledge when working on interrelated tasks. Emerging from this analysis is an empirically supported theory that while avatar-model interaction supports mutual discovery, more messy interactions of brainstorming, knowledge exchange and synthesis requires flexible, active, and informal shared visualizations. © Springer International Publishing Switzerland 2014.
Keywords
Communication; Flow Visualization; Information Technology; Knowledge Management; Visualization; Building Information Model; Bim; Collaboration; Geographical Separation; Global Virtual Teams; Informal Communication; Linguistic Differences; Virtual Team Interactions; Virtual Worlds
Kim, Sang-Chul; Kim, Yong-Woo. (2014). Computerized Integrated Project Management System for a Material Pull Strategy. Journal Of Civil Engineering And Management, 20(6), 849 – 863.
View Publication
Abstract
The purpose of this paper is to present a computerized integrated project management system and report results of a survey on the effectiveness of the system. The system consists of a scheduling system, material management system, labor/equipment system, and safety/quality control system. The backbone system is a scheduling system that adopts a production planning system and a project scheduling system. The lowest level in the scheduling system is a daily work management system, which is linked to each functional management system (i.e. material management system, labor/equipment system, and safety/quality control system). The paper focuses on the material management and scheduling systems to implement a material pull system to reduce material inventories on site. Details of material management and scheduling systems are discussed, and a sample application is presented to demonstrate the features of the proposed computer application system. The paper presents practitioners and researchers with a practical tool to integrate material management and scheduling systems for site personnel.
Keywords
Construction; Lean Construction; Material Management System; Integrated System; Daily Work Management
Abdirad, Hamid; Nazari, Ahad. (2015). Barriers to Effective Implementation of Quality Management Systems in Public Design Projects in Iran. Architectural Engineering And Design Management, 11(6), 457 – 474.
View Publication
Abstract
The goal of this research is to investigate why architectural design practice in the public domain in Iran has not implemented quality management systems (QMSs) as effectively as expected. Through an in-depth review of the literature and a set of interviews, a framework of challenges is identified and validated, and it served as the basis of a survey among high-ranked design firms active in public projects. This study shows that there are many barriers to reach design excellence, rooted in general policies and standards, characteristics of clients' organizations, and strategies and organizational factors in design firms. Although many design firms and agencies in Iran have certification of accredited QMSs, realities of architectural design practice show that norms in public projects clearly contradict principles of QMSs and make them ineffective. This study reveals a strong need for developing QMSs that address (1) true definition of design quality in standards and guidelines, (2) importance of final users and public community as true customers of public projects, (3) strategies in design firm management and organizational structures, (4) prerequisites of learning cycle in design projects, and (5) modifications in cultures and interactions among parties involved in design decision-making.
Keywords
Quality Assurance; Public Building Design & Construction; Architectural Design; Construction Project Management; Construction Industry; Iran; Architectural Practice; Design Management; Design Quality; Public Buildings; Quality Management; Organizational Factors; Organizational Structures; Quality Management Systems; Standards And Guidelines; Decision Making; 0
Kim, Sang-chul; Kim, Yong-woo; Park, Kun Soo; Yoo, Choong-yuel. (2015). Impact of Measuring Operational-Level Planning Reliability on Management-Level Project Performance. Journal Of Management In Engineering, 31(5).
View Publication
Abstract
The earned value management system (EVMS) and the last planner system (LPS) have been widely used as effective performance measurement tools for construction managers and production units at construction projects. While the EVMS measures project-level costs and scheduling performances, the LPS measures the percent plan complete (PPC), which indicates the level of planning reliability. This paper investigates the relationship between planning reliability at the operational level and project performance at the management level (i.e., the success or failure of a project). Analyzing the empirical data of 23 residential projects of a large construction company, the authors find that, while the production plan in the weekly schedule is correlated rigidly with the daily plan in successful projects, such a rigid correlation is not observed in unsuccessful projects. To understand this finding, the authors further conducted interviews with project stakeholders. Taken together, this study suggests that an emphasis on LPS indices causes subcontractors to engage in myopic behaviors such as modifying operational-level indices. Consequently, management-level production plan rigidity is at risk. The findings in this paper offer valuable insights and help project stakeholders understand the attributes of operational-level and management-level indices and their relationships. (C) 2014 American Society of Civil Engineers.
Keywords
Construction Industry; Costing; Production Planning; Project Management; Reliability; Scheduling; Subcontracting; Construction Projects; Production Units; Myopic Behaviors; Project Stakeholders; Subcontractors; Production Plan; Percent Plan Completion; Scheduling Performances; Project-level Costs; Performance Measurement Tools; Construction Managers; Last Planner System; Earned Value Management System; Management-level Project Performance; Evms; Operational-level Planning Reliability; Balanced Scorecard; Lean Construction; Contractors; Indexes; Design; Model; Earned Value; Lean; Construction; Schedule Performance Index; Cost Performance Index; Percent-plan-completion; Empirical Analysis
Chen, Peng; Shen, Qing. (2016). Built Environment Effects on Cyclist Injury Severity in Automobile-Involved Bicycle Crashes. Accident Analysis & Prevention, 86, 239 – 246.
View Publication
Abstract
This analysis uses a generalized ordered logit model and a generalized additive model to estimate the effects of built environment factors on cyclist injury severity in automobile-involved bicycle crashes, as well as to accommodate possible spatial dependence among crash locations. The sample is drawn from the Seattle Department of Transportation bicycle collision profiles. This study classifies the cyclist injury types as property damage only, possible injury, evident injury, and severe injury or fatality. Our modeling outcomes show that: (1) injury severity is negatively associated with employment density; (2) severe injury or fatality is negatively associated with land use mixture; (3) lower likelihood of injuries is observed for bicyclists wearing reflective clothing; (4) improving street lighting can decrease the likelihood of cyclist injuries; (5) posted speed limit is positively associated with the probability of evident injury and severe injury or fatality; (6) older cyclists appear to be more vulnerable to severe injury or fatality; and (7) cyclists are more likely to be severely injured when large vehicles are involved in crashes. One implication drawn from this study is that cities should increase land use mixture and development density, optimally lower posted speed limits on streets with both bikes and motor vehicles, and improve street lighting to promote bicycle safety. In addition, cyclists should be encouraged to wear reflective clothing. (C) 2015 Elsevier Ltd. All rights reserved.
Keywords
Cycling Injuries; Traffic Accidents; Transportation Planning; Data Analysis; Employment; Built Environment; Cyclist Injury Severity; Generalized Additive Model; Generalized Ordered Logit Model; Ordered Response Model; United-states; Helmet; Frameworks; Driver; Risk
Ge, Yue ‘gurt’; Lindell, Michael K. (2016). County Planners’ Perceptions of Land-Use Planning Tools for Environmental Hazard Mitigation: A Survey in the US Pacific States. Environment And Planning B-planning & Design, 43(4), 716 – 736.
View Publication
Abstract
Land-use planning tools have been extensively applied in the U.S. to achieve environmental sustainability and disaster resiliency for local communities. An important issue related to land-use planning tools is planners' beliefs about the ways in which these tools differ from each other and, thus, how planners choose among these tools for environmental hazard mitigation. A web-based survey collected data from planners in counties (or boroughs) in the five U.S. Pacific states (where county land-use planning is limited to unincorporated areas). The results indicate that planners substantially, but not completely, agreed in their perceptions of planning tools, that planners' perceptions of planning tools are minimally related to their personal characteristics and those of their jurisdictions, and that planners' perceptions of planning tools are significantly correlated with the capacity of their planning agencies. Planners viewed effectiveness (a desirable attribute) as positively correlated with economic costs and other impediments (which are undesirable attributes) so they must make trade-offs among these attributes and choose the most appropriate tool when formulating a growth management strategy.
Keywords
Interrater Reliability; Local Commitment; Management; Agreement; Index; Planners' Perceptions; Plan-making Processes; Land-use Planning Tools; Environmental Hazard Mitigation; Us Pacific States
Ochsner, Jeffrey Karl. (2016). The Emergence of Regional Modernism in Seattle Architecture from the 1930s to the 1950s. Pacific Northwest Quarterly, 108(1), 12 – 28.
Way, Thaisa. (2016). The Urban University’s Hybrid Campus. Journal Of Landscape Architecture, 11(1), 42 – 55.
View Publication
Abstract
With the growth of urban campuses in the twenty-first century, how can landscape architecture foster the innovation associated with cities and urban neighbourhoods? In Seattle, West Campus at the University of Washington serves as a good urban neighbour while engaging the traditional experiences of a campus. Additionally, the design suggests how an urban campus might generate the culture of an urban innovation district. The contribution of landscapes to innovation districts has rarely been considered in campus design because the focus has been on the architecture of the buildings and the culture of collaboration as social phenomena. This paper explores how the public landscapes of parks, courtyards, and streets shape the experience of an innovation district and contribute to fostering creativity and serendipity. As an extension, the paper suggests the importance of universities in the creation and stewardship of vibrant, creative, and resilient cities.
Keywords
City Planning; Innovation District; Student Residential Planning; University Landscape Design; Urban Campus